RAF Neatishead, Norfolk – Removal of two Radar Masts – April 2021 Think Lifting were tasked to plan and remove two redundant radar masts from inside a secure RAF facility in Norfolk. A 60t crane was used for lifting the mast, with a high level boom to sling each item and for the burners to […]
Read MoreThe removal of two redundant chimney stacks at the Pfizer complex near Sandwich. Both chimneys were part of a demolished energy centre, where we had previously hand removed a genset and associated equipment on another visit. These were the last two items to come down on site. We used a 220t crane and a high […]
Read MoreThink Lifting Ltd were pleased to be a part of the massive team effort, lead by the DE Group, to get the O2 Arena back open after it was damaged by storms. A huge clear up operation took place with Think Lifting using a cherry picker alongside a team of skilled abseilers on the roof, […]
Read MoreRemoval of a 72m high Steel Chimney at Kemsley Paper Mill in Sittingbourne Kent. A 450t Crane was used to lift the Chimney down in 4 sections.
Read MoreInstall of Transformers, Thermal Stores and AHU’s. Lowered down 6 floors, via an electric chain hoist, into the basement of the new Edwardian Hotel in Leicester Square, London.
Read MoreRemoval of a Footbridge using a 180t Crane at the British Gypsum Site in Robertsbridge.
Read MoreInstall of two 20t Engines in a North London Energy Centre, including the off-load and install of the Exhaust and Heat Exchangers.
Read MoreCranbrook Energy Center in Exeter. 350t and 60t Cranes used to lift 15t / 20m high Chimney down through the roof.
Read More