Think Lifting was tasked with lifting an air-source heat pump (ASHP) into a rooftop plant area on Lombard Street. The project required careful coordination, including securing all necessary council and TfL permits, providing full traffic management, and collaborating with two independent structural engineers. Thanks to robust planning and close collaboration, the overnight lifting operation was […]
A 220t mobile crane was used to offload the boilers onto a temporary platform. From there, each boiler was pulled into the plant room using a Tirfor winch, skated into position and carefully jacked into its final location. The operation also involved tandem-lifting two chimney sections before stacking and installing them. Finally, three thermal stores […]
Think Lifting Ltd was tasked with the removal and loading of a 19-tonne staircase. Following careful planning and coordination, two Versa-Lifts were used to safely manoeuvre the staircase from its storage position, through the building and into the crane’s working radius. The operation was completed safely and efficiently, with the staircase successfully removed and loaded […]
Think Lifting Ltd was tasked with planning and delivering a major lifting operation involving the replacement of plant equipment within a rooftop plant area. The project required detailed coordination, including arranging a road closure, planning the crane positions and carefully sequencing each stage of the lifting operation. A 450-tonne crane, fitted with a 54-metre luffing […]
Over the years, Think Lifting Ltd has been proud to support Fujifilm with lifting operations for its printer range. Our services have included unloading, loading, machinery skating, positioning and maintenance across England and Europe.