London City Airport. 60t Mobile Crane. Lifting Boilers to Roof Area.
6t Riser Base lifted into position with a 12t Fork Lift in very limited space for movement.
Millbrook Energy Centre. 2 x 15t Tanks lowered in a basement Plant Room.
Install of 2 x 17t Thermal Stores at Wembley for Kirby. Tandem Lift with a 250t Crane and an 80t Crane. The Tanks were landed on a platform and skated into the plant room for final positioning. A 4t Fork Lift was used to assist the movement of the Tanks.
Install of 2 x 18t Thermal Stores into an Energy Centre for EON. Tandem Lift with a 350t Crane and a 70t Crane.