Install of 2 x 17t Thermal Stores at Wembley for Kirby.
Tandem Lift with a 250t Crane and an 80t Crane.
The Tanks were landed on a platform and skated into the plant room for final positioning.
A 4t Fork Lift was used to assist the movement of the Tanks.